REGION

East Anglia, England

LOCATION

Southern North Sea

MAX DRAUGHT

12m

LAYDOWN AREA

121,000 SqM

REGION

East Anglia, England

LOCATION

Southern North Sea

MAX DRAUGHT

12m

LAYDOWN AREA

121,000 SqM

REGION

East Anglia, England

LOCATION

Southern North Sea

MAX DRAUGHT

12m

LAYDOWN AREA

121,000 SqM

The Premier Offshore Energy Choice

Great Yarmouth offers some of the fastest steaming times to installed and planned offshore wind farms in the Southern North Sea making it an ideal base for a cluster of energy businesses engaged in offshore wind construction, operations and maintenance.

We operate a fully functioning North Terminal, with plans to create a new Southern Terminal, consisting of an additional 400m of quay, RoRo ramp, new heavy lift pad area and approx. 10 hectares of strengthened outdoor storage space.

Strategically Located

Located within proximity to two of the largest planned windfarm developments by Vattenfall and ScottishPower Renewables, where there is a combined 6.7GW capacity to be installed. Great Yarmouth offers both a deep-water outer harbour and river harbour enabling support of Crew Transfer Vessels (CTV) and Service Operations Vessels (SOV) used for the O&M of windfarms.

Investing in the Future

At Peel Ports Group, we know how valuable your time is, which is why we've taken steps to drastically reduce downtime for customers, offering a collaborative and efficient service for your vessels in order to minimise delays to operations.

With no air draft or lock restrictions, your vessels can call into port and be turned around within 30 minutes for simple crew changes, reducing your downtime costs. That means less time in port and more time doing what you do best.

Offshore Wind Capabilties
MARINE
  • Vessel access alongside
  • Vessel access beam
  • Vessel navigation / operational restrictions
  • Distance to near OW site
  • Availability for anchorage for floating foundations
  • Current and future cranage
MATERIALS HANDLING
  • Quayside strength
  • Size of area for laydown and assembly
  • Load-bearing capacity of area for laydown and assembly
  • Pontoon space
  • Options for full fabrication and final assembly
FABRICATION & CONSTRUCTION
  • Possibilities for modular construction
  • Accommodation for crew on site/nearby
Offshore Wind Capabilties
MARINE
  • Vessel access alongside
  • Vessel access beam
  • Vessel navigation / operational restrictions
  • Distance to near OW site
  • Availability for anchorage for floating foundations
  • Current and future cranage
MATERIALS HANDLING
  • Quayside strength
  • Size of area for laydown and assembly
  • Load-bearing capacity of area for laydown and assembly
  • Pontoon space
  • Options for full fabrication and final assembly
FABRICATION & CONSTRUCTION
  • Possibilities for modular construction
  • Accommodation for crew on site/nearby
Offshore Wind Capabilties
MARINE
  • Vessel access alongside
  • Vessel access beam
  • Vessel navigation / operational restrictions
  • Distance to near OW site
  • Availability for anchorage for floating foundations
  • Current and future cranage
MATERIALS HANDLING
  • Quayside strength
  • Size of area for laydown and assembly
  • Load-bearing capacity of area for laydown and assembly
  • Pontoon space
  • Options for full fabrication and final assembly
FABRICATION & CONSTRUCTION
  • Possibilities for modular construction
  • Accommodation for crew on site/nearby
Oil & Gas Decomissioning Capabilities
MARINE
  • Vessel access alongside
  • Vessel access beam
  • Vessel navigation / operational restrictions
  • Proximity to basins / fields
  • Accommodation of SHLV/HLV drafts
  • Availability of anchorage for foundations
MATERIALS HANDLING
  • Current and future cranage
  • Quayside strength
  • Size of area for laydown and assembly
  • Load-bearing capacity of area for laydown and assembly
  • NORM and heavy metal handling and treatment capability
  • Waste recycling and disposal facilities
  • Quayside space
FABRICATION & CONSTRUCTION
  • Options for full fabrication and final assembly
  • Possibilities for modular construction
  • Accommodation for crew on site/nearby
Oil & Gas Decomissioning Capabilities
MARINE
  • Vessel access alongside
  • Vessel access beam
  • Vessel navigation / operational restrictions
  • Proximity to basins / fields
  • Accommodation of SHLV/HLV drafts
  • Availability of anchorage for foundations
MATERIALS HANDLING
  • Current and future cranage
  • Quayside strength
  • Size of area for laydown and assembly
  • Load-bearing capacity of area for laydown and assembly
  • NORM and heavy metal handling and treatment capability
  • Waste recycling and disposal facilities
  • Quayside space
FABRICATION & CONSTRUCTION
  • Options for full fabrication and final assembly
  • Possibilities for modular construction
  • Accommodation for crew on site/nearby
Oil & Gas Decomissioning Capabilities
MARINE
  • Vessel access alongside
  • Vessel access beam
  • Vessel navigation / operational restrictions
  • Proximity to basins / fields
  • Accommodation of SHLV/HLV drafts
  • Availability of anchorage for foundations
MATERIALS HANDLING
  • Current and future cranage
  • Quayside strength
  • Size of area for laydown and assembly
  • Load-bearing capacity of area for laydown and assembly
  • NORM and heavy metal handling and treatment capability
  • Waste recycling and disposal facilities
  • Quayside space
FABRICATION & CONSTRUCTION
  • Options for full fabrication and final assembly
  • Possibilities for modular construction
  • Accommodation for crew on site/nearby

Great Yarmouth Outer Harbor

The Great Yarmouth Outer Harbor offers:

  • Quay space – 32,000m2 (8 Acres)
  • Land potential – 55 acres
  • Deep water for new generation of wind
    installation vessels
  • No lock or air draught restrictions
  • Heavy lift pad, load bearing capacity of 28t
    per m2
  • RoRo ramp 35m length
  • Mobile heavy lift crane and supporting plant
    available

Great Yarmouth Inner Harbor:

  • Multiple berths
  • Designated offshore berth availabilite
  • Pontoon potential in designated berths
  • Lock free easy access at all states of tide
  • Multi-million investment for state of the art O&M Campus
  • Land to lease
  • Installation base for Sheringham Shoal and Lincs offshore wind farms
  • Purpose-built turbine pre-assembly base for Galloper offshore wind farm
  • Construction and installation base for East Anglia ONE offshore wind farm
  • Adaptable storage and warehousing
  • Dry dock facilities
  • RWE O&M base for Scroby Sands